In order to maintain a good running state and extend its service life, screw compressors need to do a good job in addition to regular maintenance, in the daily use process, but also need to do a good job of corresponding matters and measures. Compressor has a lot of failure problems are due to the user's neglect, as small as not for. At the beginning of the time may not have any problems, but a long time will cause the compressor adverse phenomenon and failure. Therefore, the use of compressor needs to do the following: 

1. The working environment of screw compressor should be kept clean and dry. The compressor and gas storage tank shall be placed in a well-ventilated place, and the sun exposure and high temperature baking are prohibited. Hot processing operations shall not be carried out around the unit.

2. Gas pipelines and gas storage tanks should be tested once every two years, pressure gauges and safety valves should be tested at least once a year.

3. When starting the compressor, it must be carried out in the state of no load. After normal operation, it will gradually enter the load operation.

4. Before opening the air supply valve, the gas pipeline should be connected well, and the gas pipeline should be kept unimpeded and not twisted. No one should work or stand in front of the air outlet.

5. The maximum pressure in the gas storage tank cannot exceed the nameplate, and the safety valve should be sensitive and effective.

6. Check that the intake valve, exhaust valve, bearing and other components have abnormal sound or overheating.

7. When there is air leakage, water leakage and electricity leakage in the unit; The indicating value of the pressure gauge, temperature meter and ammeter exceeds the specified value; Exhaust pressure rises suddenly, safety valve failure; When the machine has abnormal sound or the motor has strong spark, the machine should be shut down immediately for inspection, find out the reason and eliminate it, before restarting the operation.

8. When stopping, the load should be removed first, and then the main clutch should be separated, and then the motor should stop running.

9. After completion of the work, the remaining gas in the gas storage tank should be released, and the condensed water should be discharged in winter.


Guangdong DANNICE Refrigeration Technology Co., Ltd.

DNC Chiller is a professional manufacturer of industrial chiller, air-cooled chiller, water-cooled chiller, glycol chiller from China.

Contact

Email: lucy@dannicechiller.com

            Whatsapp/Wechat: +86 13538358223